425 303 €
425 303 €
Precio de venta | 425 303 € |
Precio por m2 | 2 577.59 € |
Superficie | 165 m2 |
Número de dormitorios | 3 |
Número de baños | 4 |
Fase de construcción | Objeto en construcción |
Fecha límite de finalización de la instalación | 2025 |
Dirección | EAU, Dubai, Tria - Silicon Oasis |
Ubicación | en la gran ciudad |
Posible pago a plazos | |
Asistencia para acreditar |
3 bedroom luxury area and rooftop pool
Tria is a high–rise residential building located in Dubai Silicon Oasis, the construction of which was launched in the second quarter of 2022. The complex will consist of three parts, united by a podium with many recreation areas for adults and children. The developer was the Deyaar company, which is known for the projects The Atria, Regalia, Midtown by Deyaar, Bella Rose in Dubai.
Tria offers a wide range of real estate types for buyers: studios, apartments with 1-3 bedrooms, podium townhouses, duplexes and penthouses. The total area of the property varies from 41 to 299 sq. m. All residences have private balconies and panoramic windows offering spectacular views of the horizon of the emirate. The apartments will have minimalistic interiors, complemented by exquisite finishes. A number of residences with 2 and 3 bedrooms will have servants' rooms and a separate dining room and kitchen. In townhouses and penthouses, in addition to all the listed amenities, there are private roof gardens.
In all types of real estate, double-glazed windows with a soundproof effect will be installed, which reduce the noise level inside the room, as well as perform the function of thermoregulation and provide protection from ultraviolet rays. Property owners will be able to control all systems inside the house using smartphones or tablets. New features include keyless access, automated control of blinds and curtains, intelligent lighting and air conditioning control systems, air filtration. Another bonus for future owners of real estate in Tria will be the availability of all necessary branded household appliances in the kitchen and bathroom.
Wi-Fi will be available throughout the complex, as well as chargers for electric vehicles.
The estimated completion date of the project is the 2nd quarter of 2025.
Payment plan 70/30
12% booking
49% Construction (per 7%)
9% completion
Post handover 30% for 3 years
For residents and guests of the complex, many high-class amenities will be offered, including:
The Tria project will be located in the developed area of Dubai Silicon Oasis, which is one of the most popular places in Dubai for renting and buying real estate. The Sheikh Mohammed Bin Zayed Road and Al Ain – Dubai Road pass near the complex, which provides excellent transport links to other areas of the emirate. The nearest Silicon Oasis Headquarters 2 bus stop is a 10-minute walk from Tria. Neighboring communities with Dubai Silicon Oasis are Nad Al Sheba, Liwan, Academic City.
The following infrastructure facilities are located 5-10 minutes' drive from the Tria Complex: