a
Version
zum drucken

195 000 €

Apartment in Torrevieja, Spanien, 98 m2
  • Apartment in Torrevieja, Spanien, 98 m2 - Foto 1
1/1
  • Apartment in Torrevieja, Spanien, 98 m2 - Foto 1
  • Objekt-ID auf der Website Prian.info: 3434933
    Objekt-ID auf der Website des Anbieters: 174141
    Datum der letzten Aktualisierung: 07.12.2021
    Anzahl der Ansichten: 171

195 000 €

Apartment in Torrevieja, Spanien, 98 m2

98 m2 3 2 2

  • Auf der Karte
  • Video
  • Objekt-ID auf der Website Prian.info: 3434933
    Objekt-ID auf der Website des Anbieters: 174141
    Datum der letzten Aktualisierung: 07.12.2021
    Anzahl der Ansichten: 171

Wichtigste Eigenschaften

Verkaufspreis 195 000 €
Preis pro qm 1 990 €
Fläche 98 m2
Etage 1
Anzahl der Etagen 2
Gesamtzahl der Zimmer 3
Anzahl der Schlafzimmer 2
Anzahl der Badezimmer 2
Bauphase Neues Gebäude

Beschreibung

Lovely area! Apartments in Torrevieja

Great location close to the center of Torrevieja! Surrounded by shopping malls and restaurants, close to a general hospital. 20 minutes drive to golf courses and only 40 minutes from Alicante airport. The surrounding area has a wide variety of blue flag beaches.


This fully gated community offers 2 and 3 bedroom apartments with stunning sea views. Access to the complex is organized by 3 pedestrian entrances and 1 car access directly to the underground parking. Automatic garage doors are equipped with a remote control and a security system. The complex offers.


Specification:
- Built-in wardrobes with lacquered doors, shelves, drawers and hanging railings.
- Kitchen furniture with compact quartz top and steel sink with high-quality tap and extractor hood.
- The bathrooms have a sink with countertop, mirror and lighting.
- Motorized blinds.
- SPA pre-installation.
- Solarium.
- Design brand elevator with a capacity of 6 people, with provision for access for people with disabilities.
- Floor - high quality ceramics and non-slip ceramics on the outside.
- Access from the basement to all apartments.
- Alarm systems from Securitas Direct.

Completion of construction - July 2023.