95 000 €
95 000 €
Sale price | 95 000 € |
Price per square meter | 904.76 € |
Floor area | 105 sq.m |
Floor | 5 |
Number of storeys | 12 |
Total number of rooms | 3 |
Number of bedrooms | 2 |
Number of bathrooms | 2 |
Construction phase | Off-plan |
Facility completion deadline | 01.07.2024 |
Address | Turkey, Mersin |
Location | at the seaside, within the city |
to the beach | 180 meters |
Type | Three-room Apartment |
Maintenance | |
---|---|
Annual tax | 20 € |
Apartments 2+1 and 3+1 from the builder, Erdemli district Tomyuk microdistrict, Mersin. From 95.000 euros.
About the neighborhood: One of the most rapidly developing areas in Mersin. In the near future Tomyuk will be gasified. There is already all the urban infrastructure that is necessary for life: supermarkets, pharmacies, schools, health center, farmers market, restaurants, bakeries, parks. The area is well connected to all parts of Mersin.
The neighborhood is known for its wide, long sandy beaches, fine sand and smooth, soft entrance to the sea. Even small children will find it comfortable to swim here, as the depth of the sea increases very smoothly. On the city embankment there are bicycle paths, benches for rest. Tomyuk is perfect for living here on a permanent basis, as well as for recreation.
For sale:
Apartment layout 2+1, 3+1 from the developer in the under construction LCD, Ayash, Mersin.
Layout:
Kitchen-living room and 2 or 3 bedrooms, 2 bathrooms, spacious balcony.
LCD infrastructure:
1. swimming pools
2. Aquapark
3. Children's playground
4. Sauna
5. Fitness
6. Barbecue area
7. Basketball court
8. Table tennis
9. Steam room
10. Landscape design
11. Generator
12. outdoor parking lot
13. Protected territory
Area: 105- 140 m²
Land plot area: 3 500 m²
Number of blocks: consists of 2 twelve-storey blocks.
Distance to the sea: 180 meters
The apartments are delivered with finishing: steel entrance door, closet in the hallway; American kitchen; interior doors; flooring: ceramic tile in the kitchen, bathrooms, balconies; in the living room and bedrooms - laminate; walls are painted with paint on silicone base; suspended ceiling; outputs for air conditioners and radiators, video intercoms; kitchen cabinets; bathrooms equipped with sanitary ware and shower cabins 1-st class.
Completion of construction is scheduled for: 01.07.2024.