168 000 €
168 000 €
Sale price | 168 000 € |
Price per square meter | 2 000 € |
Floor area | 85 sq.m |
Number of storeys | 4 |
Total number of rooms | 3 |
Number of bedrooms | 2 |
Number of bathrooms | 2 |
Construction phase | Off-plan |
Facility completion deadline | 08.2024 |
Address | Turkey, Alanya, Turkler |
Location | at the seaside, in suburbs, on a SPA-resort |
Possible payment by installments |
In February 2023, started construction of new residential complex in Turkler district, the city of Alanya.
This is quiet area on the Mediterranean coast, which promises a comfortable and peaceful life, against the backdrop of magnificent nature. There are 5* hotels located here, and residential complexes are attractive for domestic and foreign investors.
Turkler is located 16 km from the center of Alanya, 55 km from Gazipasa Airport and 90 km from Antalya Airport.
The new project is located a few minutes' walk from the sea, only 600 meters, and also close to the city infrastructure.
●In total, the project includes 22 Villas and 55 apartments.
Project includes two types of duplex apartments- duplexes with a garden and upper duplexes with a 2+1 layout. American-style living room, 2 bedrooms, each with its own bathroom. Prices from 168,000€
Apartments and villas will be commissioned in a fine finish: American-style kitchen, built-in kitchen set and entree, flooring - laminate or ceramic tile. Steel entrance doors with a first-class degree of protection, ceilings with spot and LED lighting, washable paint on the walls, fully equipped bathrooms, double glazing, video phone, fire alarm system.
And the infrastructure provides absolutely everything you need, both for permanent residence and for a comfortable stay:
● Outdoor pools with sun loungers and a children's section
● Gazebo and recreation area
●Barbecue area
●24/7 security, CCTV cameras
● Auto parking
● Generator
● Spa center
● Fitness room
● Hamam
● Sauna
● Cinema
● Cafe
● Game room
● ; Wireless Internet
● Satellite TV
With an initial payment of 30%, an interest-free installment plan is provided until the end of construction.
●Date of completion of construction: 30.08.2024
Prices are current on 03/05/2024